Principal Contractor
Replacement of combustible cladding
As a leading Principal Contractor, our services epitomize a comprehensive approach to construction project management, characterized by efficiency, expertise, and unwavering commitment to excellence. We assume the central role in orchestrating and overseeing every facet of the construction process, seamlessly integrating planning, execution, and coordination. Our experienced team collaborates closely with clients, architects, and subcontractors to ensure that projects are delivered on time, within budget, and to the highest standards of quality. With a focus on proactive problem-solving and risk management, we navigate challenges seamlessly, allowing our clients to witness their visions transform into reality. Safety is paramount in our operations, and we implement stringent measures to create secure work environments. Whether it's a commercial, residential, or industrial project, our role as a Principal Contractor is defined by meticulous planning, transparent communication, and a dedication to achieving optimal outcomes for our clients.
• Phase 1
Green Facades uses its in-house design and expertise in the production of a compliant technical design. A series of technical designs are produced, along with necessary pre-installation inspections, pull-out tests, wind and U-Value calculations, as well as sample production.
• Phase 2
Condition surveys of all apartments before the works along with site setup including scaffolding and waste management.
• Phase 3
Stripping of the old facades and installation of the new external wall system. This phase takes place under a strict quality monitoring regime accompanied by close photographic evidence of ongoing workmanship.
Nine
Project Value : £3,300,000
Nine Sutton Court is a residential tower block. The works for this project include the replacement of flammable materials comprising of insulated render, rainscreen cladding and inset balcony decking.
Moblery Leisure Centre
Project Value : £1,800,000
Moblery Leisure Centre is a completed project consisting of replacement of combustible insulation.
109 The Circle
Project Value : £5,000,000
109 The Circle is a residential complex comprising of three residential blocks. The works for this project consists of replacement of rainscreen cladding, insulated render, spandrel panels and decking.